Development tracker
Find a project by city, street or name. Each record shows its status and sources.
Development tracker

Benicia Senior Housing (Eden Housing)
City-owned downtown sites (Scout and Senior Center sites)
Up to 109 affordable apartments for residents 55 and older on city-owned sites, plus a replacement senior center and public parking. City Council approved the development agreement with Eden Housing on May 5, 2026. Completion date not announced.

Benicia refinery site redevelopment (proposed)
About 900 acres at the Valero Benicia Refinery
Concept to redevelop the roughly 900-acre refinery site with about 3,500 homes, up to 600,000 sq ft of commercial, up to 3 million sq ft of industrial and about 150 acres of parks. Preliminary and not approved; Valero still owns the site. No timeline announced. The developer is Signature Development Group of Oakland, founded by Michael Ghielmetti. The company presented its ideas to about 100 people in June, the Vallejo Sun reported. It began talking with Valero in April 2025, and the two have a confidential agreement. Homes would go on the grassy hills around the refinery and could include single-family houses, townhomes and senior housing. Shops might follow the open-air model of The Veranda in Concord. The industrial core would stay industrial, and the company said it is not considering a data center. A park would be modeled on Heather Farm in Walnut Creek. None of it can start until the refinery fully closes, Mayor Steve Young said. The state may also use the site's tanks to bring in gasoline and diesel by ship. "If this goes on for 10 or 20 years, then we've got real issues," Young told the Vallejo Sun in its June 22, 2026 report. Cleanup comes first in any case. The soil under the industrial area is the most contaminated, and the work will involve local, state and federal agencies. Signature said it aimed to file a formal application in fall 2026. Solano Daily has not confirmed whether it has.

Jefferson Ridge
7.9-acre site (see city project page)
121 attached single-family homes and a 2,000 sq ft commercial building on 7.9 acres, approved ministerially in August 2022. Construction status and completion date not announced.

Rose Estates
527-acre site (see city project page)
Proposed 1,620 homes (1,440 single-family, 180 multifamily) with 110,000 sq ft of commercial, 152,000 sq ft of industrial and about 256 acres of parks and open space. The city began an environmental impact report in June 2026. No approval yet.

Walnut Park Library (South Davis)
2660 Lillard Drive, west end of Walnut Park
Yolo County postponed the planned November 7 opening. Library officials now expect the South Davis branch to open in early 2027. The county has yet to announce a day.

Harvest Master Plan (Lewis Group)
About 1,166 acres southeast of Dixon, between Pedrick Rd. and Hwy. 113, south of Parkway Blvd.
Proposed annexation and master plan for up to 6,300 homes, 10-15 acres of commercial, light industrial and parks, built over 20 to 30 years. The city issued a revised EIR notice of preparation June 26, 2026; a draft EIR is expected in spring 2027. No approval yet.

Homestead (Southwest Dixon Specific Plan)
Southwest Dixon Specific Plan area
1,327 single-family lots approved in 2020; the city says 1,061 homes are built. Richmond American's Sunrise and Celebration villages started construction in early 2026 (10 homes done), and the last village, Village 13 ('Bellera'), is in infrastructure and master-plan review. Build-out date not announced.

The Campus / Dixon 257 (Northeast Quadrant)
257 acres on Pedrick Rd., Northeast Quadrant
Mixed-use plan with 1,041 homes, 660,000 sq ft of research and tech space, 2 acres of commercial and parks. City Council approved it in March-April 2025 with a 20-year development agreement. Subdivision and improvement plans are ready to issue once a builder is identified. Completion date not announced.

Aurora at One Lake (KB Home)
Vanden Rd. and One Lake Dr.
KB Home opened this two-story single-family neighborhood inside One Lake on July 31, 2026; the city's bond staff report says KB closed escrow on all 85 lots in Neighborhood C. Completion date not announced. Aurora's homes are two-story, single-family houses with up to five bedrooms and three bathrooms, priced from the $590,000s when the community opened, according to KB Home. The models are at the corner of Vanden Road and One Lake Drive. "We're bringing beautiful new homes to the sought-after One Lake master plan," Matt Sauls, president of KB Home's North Bay division, said in the July 31, 2026 opening announcement. KB's release points to the Fairfield-Vacaville train station, Interstate 80 and Travis Air Force Base. Aurora is in the Travis Unified School District. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in these listings.

Cascade at One Lake (K. Hovnanian)
One Lake, Planning Area 5 (Neighborhood A/B)
Fairfield's Planning Division approved 67 single-family homes by K. Hovnanian Homes in One Lake's Planning Area 5, and Cascade is now on the market. Listings checked Nov. 15, 2026 show three two-story floor plans of 2,530 to 2,588 square feet, starting at $718,490, $733,990 and $740,990. Six homes were listed for quick move-in, priced from $759,990 to $788,990. The sales office is at 5711 Calero Court. Amenities listed for the community include an amenity center, a pool, a park and an event lawn. Some plans offer what K. Hovnanian calls an Extra Suite+, an apartment-style living space inside the home. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in these listings. A completion date for the neighborhood has not been announced.

Fairfield Industrial Center II
Gateway to Fairfield's industrial park, visible from Hwy. 12 (exact address not published)
Planned second phase of Fairfield Industrial Center: two Class A industrial buildings totaling 328,553 sq ft. The developer lists a 2026 start and estimated completion in 2027.

Hale Ranch Agricultural Industrial District
189 acres bounded by I-80, Hale Ranch Rd. and Cordelia Rd.
City-proposed zoning district for 189 acres aimed at winemaking, agritourism, food science and specialty food manufacturing, with general warehousing and non-food manufacturing prohibited. No specific project yet. The city says the district fits its 2024 General Plan. More information is at fairfield.ca.gov/hale, or from the Community Development Department at 707-428-7461. Part of the study area is already for sale: a 48.39-acre parcel at Hale Ranch and Cordelia roads is listed by Colliers without a price. It is zoned A-20, an agricultural zone, under the county. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in this listing. City staff will present the proposed zoning on Monday, Nov. 16, from 6 to 7:30 p.m. in rooms Lakeside A and B at the Fairfield Community Center, 1000 Kentucky St.

Lago Vista (Villages at Fairfield expansion)
East of High Line Dr. and Golden Way, north of Air Base Pkwy. (APNs 0170-050-540, -550)
375 homes on a vacant 37.3-acre site: 151 single-family houses and 224 multifamily units. Approved by the Planning Commission (Aug. 13, 2025) and City Council (Sept. 2 and 16, 2025). The city's resolution said backbone infrastructure would start in 2026. Builder and completion date not announced.

Northeast Fairfield industrial park (Canon Partners / NorthPoint)
Between Vanden Rd. and North Gate Rd., northeast Fairfield
300-acre industrial campus with a 4.6-million-sq-ft master development permit approved by the Planning Commission in 2023. Investor materials floated a 150 MW data center; in November 2026 the City Council passed a 45-day citywide moratorium on data centers. No building application filed, per the city. Completion date not announced. Canon Partners owns the land. The company is controlled by Andrews Lando & Associates and Stroud Properties, the Vallejo Sun reported. The pitch to investors was circulated by the brokerage Jones Lang LaSalle and NorthPoint Development, which is based in Kansas City. The 2023 permit sets rules for utilities, traffic and building design but doesn't include construction plans. Any building would need a formal application and a public hearing. One investor slide said the zoning allowed a data center "by right." Canon Partners was also studying what it would cost to bring in enough PG&E power. The City Council's vote for the 45-day pause was unanimous. It blocks projects with 5,000 square feet or more of server space or a power load of 1 megawatt or more. NorthPoint had been planning warehouses under the approved plan and had asked whether a data center would fit, the Sun reported. "This moratorium represents the will of the people," Jeremy Weber, who has organized residents near the site, told the council, the Vallejo Sun reported Nov. 11, 2026. The council can extend the moratorium for one or two years, and a staff report is due by Dec. 15.

One Lake (Train Station Specific Plan, Planning Areas 4-5)
Off Vanden Rd. and One Lake Dr., near the Fairfield-Vacaville train station
Master-planned community planned for about 1,937 single-family and multifamily homes plus a 190-unit apartment complex and about 20,000 sq ft of retail. Under construction with homes on sale from Lennar, Tri Pointe, Century, KB Home and K. Hovnanian. As of June 1, 2026, the 932-lot first improvement area had 120 finished homes and 41 under construction. Full build-out date not announced. One Lake is sold neighborhood by neighborhood, and the range is wide. On Nov. 14, 2026, a new-home listing site showed starting prices from $561,820 at Emerald and $599,000 at Sunflower up to $798,900 at Glisten and $859,900 at Splash. Serenity started at $645,880 and Swirl at $744,170. Builders describe a lake, a pool and spa, a club lounge, a community center, an amphitheater and parks. KB Home puts the lakefront recreation area at 21 acres, with playgrounds, trails and an event lawn. The neighborhood is in the Travis Unified School District. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in these listings.

Parkside Flats (168 affordable apartments)
1600 Woolner Ave.
Completed: 168 affordable family apartments in six three-story buildings on a former city water-treatment brownfield next to Allan Witt Park, for lower-income households. The contractor announced completion on Oct. 1, 2026.

Tabor Commons (EAH Housing)
212 E. Tabor Ave.
67 affordable family apartments (66 restricted plus a manager's unit) on a 2.6-acre site, 16 reserved for people with intellectual and developmental disabilities. State tax-credit staff report says construction is expected to begin in February 2027 and be completed in July 2028.

The Villages at Fairfield
Northeast Fairfield along Clay Bank Rd., Manuel Campos Pkwy. (Cement Hill Rd.) and Walters Rd.
840-acre master-planned community with about 2,100 homes in four villages; Lago Vista and Village 5 (formerly Hawthorne Mill) would add about 950 more. Builders currently selling include D.R. Horton (Iris) and Discovery Homes (Melrose, Summerwalk). Build-out date not announced. The Villages was first approved in 2005. The city substantially updated the master plan in 2015 and began further revisions in 2025. The latest piece is Parkside at Villages: 76 single-family homes on about 8 acres at Gulf Drive and Passion Lane, which would finish out Village 1. The land had been held for an elementary school. The Fairfield-Suisun school district declined to buy it and doesn't plan to build there, according to the city. The Planning Commission approved the lot map and house designs on Oct. 8, 2025, and sent the zoning change to the City Council. A 5.2-acre neighborhood park is planned at Gulf Drive and Portland Drive, and the city is talking with the school district about adding about 2 acres next to it. The plan also includes about 200 acres of open space, more than 20 acres of parks, two commercial sites and a Linear Park trail. Discovery Homes is selling Melrose at the Villages from $655,725 (three to four bedrooms, 1,691 to 2,146 square feet) and Summerwalk from $799,000 (four to five bedrooms, 2,474 to 2,818 square feet), according to listings checked Nov. 14, 2026. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in these listings.

Vista Ridge Apartments (hotel-to-housing)
3331 N. Texas St. (former SureStay Hotel)
Conversion of the former 100-room SureStay Hotel into 50 one-bedroom permanent supportive apartments for people experiencing or at risk of homelessness, with on-site services. City Council approved it in late 2025; the Daily Republic reported construction could take about a year. Completion date not announced.

Liberty (55+ community)
Liberty subdivision; sales at 2209 Stripes Glen
Age-restricted (55+) gated community the city lists at 855 units with infrastructure and model homes built. DeNova Homes is selling single-story homes and duets in its Luminescence section. Build-out date not announced.

Riverwalk
Riverwalk subdivision area (see city map)
Approved plan for 783 single-family homes, 240 multifamily homes, commercial space and a new public-safety facility. The city's 2026 General Plan draft says no site development had occurred as of 2024; entitlements run through 2033. Completion date not announced.

Midway Plaza
NE corner of Midway and Lewis roads
County Planning Commission approved a 14,575 sq ft convenience store, a 4,320 sq ft drive-through restaurant and a 3,000 sq ft restaurant; water-permit steps remain before occupancy.

Collinsville maritime industrial rezone
1,312 acres east of Collinsville
County proposal to rezone 1,312 acres from Exclusive Agriculture to Industrial-Water Dependent for possible maritime uses. It does not approve a shipyard or any project; future development would still need a specific plan, use permit and environmental review. Board of Supervisors vote expected in December 2026.

Almond Garden affordable apartments
Location not published in city update
97 affordable apartments. The city reported in May 2026 that construction had officially started. Completion date not announced.

Awanta apartments
Main St.
20-unit apartment building on Main Street approved in August 2025. Completion date not announced.

Dutch Bros Coffee
97 Sunset Center
New Dutch Bros Coffee drive-through. The city said in its June 2026 newsletter that construction had begun; in May it had said the project was nearing building-permit issuance. The company's location page still listed the shop as coming soon on Nov. 13, 2026. Opening date not announced.

Highway 12 Logistics Center
South of Hwy. 12 at Pennsylvania Ave.
About 1.28 million sq ft of warehouse and logistics space. City Council adopted the zoning and planned-unit-development ordinances on Dec. 3, 2024. Construction start and completion dates not announced. The developer is Buzz Oates Construction, which filed its application in 2021. The project needs land annexed into Suisun City, so the Solano Local Agency Formation Commission also has to sign off. The council's first vote, in November 2024, was 4-1, with then-Vice Mayor Princess Washington voting no, the Daily Republic reported. The council adopted the ordinance on Dec. 3, 2024, on a 5-0 vote, according to the city's notice of adoption. The two records describe the project's size differently. The city's notice describes a 1.28 million-square-foot warehouse and logistics project. The Daily Republic's report on the first vote described 529,708 square feet on 53 acres, with the rest of the land kept as managed open space, and said the Planning Commission had recommended the original 1.28 million. Solano Daily has not reconciled the two. The project as the Daily Republic described it was expected to bring the city's general fund more than $1.8 million in revenue against $635,000 in expenses. Steve Chappell of the Suisun Resource Conservation District told the council a similar plan was proposed in 2006 as the Gentry Project and abandoned, the newspaper reported.

Lotz Residences (Lotz Way townhomes)
Lotz Way
16-home neighborhood with accessory dwelling units, listed as entitled in the city's September 2025 calendar; in May 2026 the city said it was reviewing plans for the 16 townhomes. Completion date not announced.

McCoy Creek Mixed-Use
McCoy Creek Rd.
31 apartments with commercial space. Listed as under review in the city's September 2025 calendar; by May 2026 the city said it was processing permits. Completion date not announced.

Olive Tree Ranch
Off Olive Ave., south of E. Tabor Ave.
Proposed subdivision of about 70 single-family homes, under city review as of the September 2025 development calendar. Completion date not announced. The site is off Olive Avenue, just south of East Tabor Avenue. The applicant, Suisun Investments, describes a gated neighborhood of 70 single-family lots with a park and open space. This is a second try. The City Council approved an 80-lot map for the southern part of the site in 2010, but that approval ran out. The new plan adds a 2.75-acre parcel and still cuts the lot count to 70. The streets would be private and maintained by a homeowners association, which the applicant says would lower the city's upkeep costs. The developer held a neighborhood meeting on Feb. 28, 2024, at the Joseph Nelson Community Center.

Suisun Expansion Project (California Forever)
22,873 acres of unincorporated land around Hwy. 12 and Hwy. 113 proposed for annexation
California Forever's proposal to annex 22,873 acres into Suisun City. The city's November 2025 environmental notice describes about 65,217 homes and 84,479 jobs in a 20-year plan on 6,080 acres, and about 173,913 homes and 225,471 jobs at full build-out on 15,737 acres. In environmental review; no approval or construction date. The City Council opened the door on June 10, 2025, voting 4-1 for an agreement that has California Forever pay for the city's staff time, consultants and environmental review. Councilmember Princess Washington cast the no vote. The company put down $400,000 and agreed to pay $10 million for public benefits if the annexation goes through: $3.5 million if the city presents an annexation plan and $6.5 million if the county's boundary commission approves it. Deputy City Manager Jim Bermudez laid out a schedule in May: a draft environmental report in fall 2026, certification by winter, approval hearings in spring 2027 and a decision by the Solano Local Agency Formation Commission in 2027 or 2028, the Vallejo Sun reported. The council is weighing only a first phase, the Sun reported; anything more would need a new environmental review. "Suisun City needs growth, it needs industry," City Manager Bret Prebula said, according to the Vallejo Sun's May 15, 2026 report. Opponents want a public vote. In April, the Solano Together coalition rallied outside City Hall and asked the council to put an advisory measure on the November 2026 ballot. The Nov. 3 election has not changed the city's direction, on the count so far. Mayor Alma Hernandez, who told KQED before the election that she would continue exploring annexation, led with 37.2% (3,242 votes) in results updated Nov. 13. Councilmember Amit Pal had 28% and Michael Jefferson 16.2%. Jefferson told KQED he planned, on his first day as mayor, to have two council allies vote with him to terminate the city's contract with California Forever. Results have not been certified. Solano Daily had not confirmed, as of Nov. 15, whether the draft environmental report has been released. The city's schedule called for it in fall 2026.

Suisun Logistics Center
East of Walters Rd., south of Petersen Rd.
Proposed warehouse and distribution center in environmental review; a partially recirculated draft EIR was open for comment through Sept. 8, 2026. The city says this and the Highway 12 project together total nearly 3.4 million sq ft. Completion date not announced. Buzz Oates Construction proposes about 2.1 million square feet of warehouses in six buildings, the smallest at 145,397 square feet and the largest at 644,782. They would cover about 120 acres of a 167.43-acre site. The remaining 47 acres would be kept as open space. The land is grazing land in the unincorporated county, inside Suisun City's planning area, and all of it would be annexed. Travis Air Force Base is on its east side, Petersen Road on the north and Highway 12 on the south. Trucks and cars would enter at one point on Walters Road and three on Petersen Road. An earlier state filing estimated 2,843 jobs.

A&P Children's Investments Property (ELTGA, File 24-047)
East side of Leisure Town Rd, south of Fry Rd (127 acres)
Conceptual landowner plan for about 1,027 homes (detached houses, townhomes and duplexes), a small mixed-use area and parks on 127 acres east of Leisure Town Road and south of Fry Road, part of the East of Leisure Town planning effort. Farmland today; not approved.

Brighton Landing
SE corner Leisure Town Rd & Elmira Rd (includes Rose St / Rose Ct)
Finished 767-home community at the southeast corner of Leisure Town and Elmira roads, including Rose Street and Rose Court; approved in 2013, all 12 villages are listed complete by the city. Listed here for context: this is the neighborhood on the east side of Rose Street and Leisure Town Road, and it is not a Taylor Morrison project. The plan covers about 217 acres. Besides the 767 homes in 12 villages, it set aside a 50-acre private high school parcel, an 11-acre public school parcel and a 6-acre park with public trails, according to the city. The council approved the tentative map on Feb. 26, 2013. The New Home Company built the largest share. It announced in October 2018 that construction was underway on 418 homes in five neighborhoods, with prices expected to start in the $500,000s. Its first two neighborhoods were Bristol and Oxford, according to Builder magazine. Two more, Preston and Sheffield, opened on Sept. 21, 2019.

Carmello II at Roberts Ranch (Village L)
N of Fry Rd, E of Leisure Town Rd, SW of Village C; sales at 312 Baler Cir
Taylor Morrison's Carmello II neighborhood in Roberts' Ranch, just east of Leisure Town Road. The city lists it as under construction; Taylor Morrison's site says it is sold out. Lot count and finish date not announced.

Cheyenne (Rice-McMurtry)
West of Shelton Ln & Browns Valley Rd, north of McMurtry Ln
Cheyenne: 221 single-family homes. Completion date not announced.

East of Leisure Town Growth Area Specific Plan
East of Leisure Town Rd between Ulatis Creek and south of Fry Rd (Hawkins/Fry corridor)
City-led specific plan for about 508 acres of planned development, within a 601-acre annexation area, east of Leisure Town Road between Ulatis Creek and south of Fry Road, with a draft plan of about 4,219 homes plus parks, a school site and mixed use. Environmental review began with a November 2025 notice; in October 2026 the council expanded the EIR contract. Not approved. The plan covers part of a much larger area. Vacaville's 2015 General Plan set aside the East of Leisure Town Road Growth Area at 1,317 acres, of which 669 are inside the city and 648 are in the unincorporated county. All of it is inside the city's urban growth boundary, and the city expects to annex the county land if the council approves a specific plan. The city says it has received development applications from three landowners in the growth area. The land is farmland today. The state's Department of Fish and Wildlife has sent the city a letter on what the environmental study should cover. The city's contact for the project is planner Albert Enault, at (707) 449-5364.

Farmstead (Farmstead Square)
SE corner N. Orchard Ave & Fruitvale Rd
130-home Taylor Morrison neighborhood at the southeast corner of North Orchard Avenue and Fruitvale Road. Taylor Morrison lists it as sold out; the city's status table still lists it as under construction. Exact completion date not confirmed.

Foxboro Knolls
Vanden Meadows
58-home Pulte Homes neighborhood in Vanden Meadows. Sources disagree: the city's status table lists it as under construction, while an October 2026 news report says it is finished. Completion date not confirmed.

Greentree
Former Green Tree golf course: Leisure Town Rd, Sequoia Dr, Orange Dr, Gilley Way
Redevelopment of the former Green Tree golf course (Leisure Town Rd., Sequoia Dr., Orange Dr., Gilley Way) approved in late 2022 for 1,149 homes, including about 950 higher-density units north of Sequoia, 199 senior single-family homes south of Sequoia, and up to 299,345 sq ft of commercial. Construction status and completion date not announced. The Green Tree Golf Club closed after 55 years. The family that owned it told CBS Sacramento that play had fallen from 110,000 rounds a year to about 30,000. The council took up the redevelopment at meetings on Nov. 15 and Dec. 13, 2022. The site is 185.4 acres. The city's development agreement is with Green Tree South LLC and Green Tree Properties LLC. "The Greentree Project is a classic infill, mixed-use development," Erin Morris, the city's community development director, told the Greenbelt Alliance, which endorsed the plan in July 2022. The most detailed piece so far is a 240-unit garden apartment complex on 10.77 acres along Gilley Way, at the north end. Plans show 11 three-story buildings, a 5,465-square-foot community building, a pool and spa, a dog park, a tot lot and 444 parking spaces. The plan also sets aside a 6-acre neighborhood park north of Sequoia Drive, a 4.5-acre park south of it and 19.8 acres for a public trail corridor and open space. A state notice posted Sept. 28, 2023, covers Phase 1: mass grading, roads and utilities, and a stormwater basin that drains to Horse Creek. Solano Daily has not confirmed how far that work has gone.

Harmony at Roberts Ranch (Villages G/H)
Marshall Rd, east of Tractor Dr; sales 4019 Marshall Rd
Harmony at Roberts Ranch. Builder: Beazer Homes (now part of Dream Finders Homes). Completion date not announced.

Harvest Ridge Subdivision
NW corner Leisure Town Rd & Redstone Pkwy (Southtown)
134 single-family lots on a 9.91-acre site at the northwest corner of Leisure Town Road and Redstone Parkway. The Planning Commission approved the tentative map April 21, 2026. Owner of record is TA Leisure Town, LLC; no home builder named and no house plans yet. Completion date not announced.

Hawthorn Hills at Lagoon Valley
Lagoon Valley
Hawthorn Hills at Lagoon Valley. Builder: Lennar. Completion date not announced.

I-505 / Vaca Valley Parkway Corridor Multimodal Improvements
I-505 / Vaca Valley Pkwy
Multimodal road improvements on the I-505 / Vaca Valley Parkway corridor. Environmental document adopted (state notice March 19, 2026). Construction dates not announced.

Independence in Vacaville
SE corner Vaca Valley Pkwy & Allison Pkwy
Independence in Vacaville: 232 apartments. Completion date not announced.

Iris Gardens at Lagoon Valley (Neighborhood C)
Lagoon Valley
Iris Gardens at Lagoon Valley: 56 single-family homes. Builder: K. Hovnanian Homes. Completion date not announced.

Jepson Center drive-through (6111 Leisure Town Rd)
6111 Leisure Town Rd
Time extension of a use permit for a drive-through in a 3,000 sq ft tenant space at 6111 Leisure Town Road (state filing Oct. 27, 2026). Tenant not named; opening not announced.

Lagoon Valley (Lower Lagoon Valley master plan)
Lagoon Valley, off I-80 / Lagoon Valley Rd (sales 206 Hyde Park Pl)
Lower Lagoon Valley master plan: about 1,025 homes around a golf course plus a 60-acre business village and town center. Lennar, Taylor Morrison, D.R. Horton and K. Hovnanian are building or opening neighborhoods; the developer said in June 2026 that more than 130 homes had sold. The city's status table still lists the phases as 'no activity.' Build-out date not announced. The developer's June announcement listed five neighborhoods: Hawthorn Hills and Lilac Ridge by Lennar and Rosemary Grove by Taylor Morrison, each selling a second phase, plus Iris Gardens by K. Hovnanian and Lavender Glen by D.R. Horton, both due in the fall. The full plan has 14 neighborhoods linked by trails, with more than 1,300 acres kept as open space. "It is truly a live-work-play community built on sustainable principles," Curt Johansen, Lagoon Valley's development director, said in the June 25, 2026 release. The release said pickleball courts and Linear Park would open in September, and that construction of the Lagoon Valley Event Center and Swim Club was expected to begin over the summer. Solano Daily has not confirmed whether either happened on schedule. Prices sit well above the rest of Vacaville's new-home market. Taylor Morrison lists Rosemary Grove from $895,000, and Lennar's move-in-ready homes at Lilac Ridge were listed between about $1.04 million and $1.14 million on Nov. 14, 2026. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in these listings. The visitors' center is at 200 Mount Royal Road, open Wednesday through Sunday, 10 a.m. to 6 p.m.; phone 707-724-6937.

Lavender Glen at Lagoon Valley
Lagoon Valley
Lavender Glen at Lagoon Valley: 105 single-family homes. Builder: D.R. Horton. Completion date not announced.

Lilac Ridge at Lagoon Valley
Lagoon Valley
Lilac Ridge at Lagoon Valley: 69 single-family homes. Builder: Lennar. Completion date not announced.

McMurtry Creek Estates
McMurtry Ln (annexation from county)
McMurtry Creek Estates: 20 single-family homes. Completion date not announced.

Montessa (build-to-rent)
Montessa, Vacaville (montessavacaville.com)
59-lot build-to-rent neighborhood by Discovery Builders where each lot has a house, an ADU and a junior ADU, for 169 rentals. The builder says it is complete and fully leased; the city's status table still lists it as under construction.

North Orchard Oaks Apartments
NW corner W. Monte Vista Ave & N. Orchard Ave
North Orchard Oaks Apartments: 36 apartments. Completion date not announced.

North Village (master plan)
Bounded by Midway Rd, Leisure Town Rd, Vaca Valley Pkwy and I-505
2,499-home growth area bounded by Midway Road, Leisure Town Road, Vaca Valley Parkway and I-505. The city lists Units 1-6 and 7A complete, Units 7B/7C (168 homes) under construction, and the Area Plan 2 revision in process. Build-out date not announced.

Nut Tree Apartments
Nut Tree Rd, behind Nut Tree Village Shopping Center
Nut Tree Apartments: 216 apartments. Completion date not announced.

Nut Tree Business Park (two warehouses)
10 & 20 Nut Tree Rd
Two warehouse buildings totaling about 169,000 sq ft at 10 and 20 Nut Tree Road. The approval has been extended four times, most recently in July 2026; not built.

Oak Grove Apartments (senior affordable)
475 W. Monte Vista Ave
Oak Grove Apartments: 60 affordable homes. Developer: Eden Housing (Eden Oak Grove, LLC). Completion date not announced.

Orange Apartments and Retail
South of Orange Dr, east of Leisure Town Rd
Orange Apartments and Retail: 73 homes and about 9,600 sq ft of commercial space. Developer: Leisure Town Apartments, LLC. Completion date not announced.

Parkway at Roberts Ranch (Village D)
953 Carroll Way (Baler Ct, Winnower Ct/Cir, Cask Ct, Costrel Ct)
Parkway at Roberts Ranch. Builder: Crowne Communities. Completion date not announced.

Potters Court North
Potters Ct & Cogburn Cir
Potters Court North: 18 single-family homes. Completion date not announced.

Quinn Road affordable housing (California Supportive Housing)
City-owned property on Quinn Rd
Planned affordable housing on city-owned land on Quinn Road with California Supportive Housing; on Oct. 13, 2026 the council considered extending the exclusive negotiating agreement toward a development agreement. Unit count and timeline not announced.

Roberts' Ranch (master plan)
NE corner Leisure Town Rd & Fry Rd
785-home master-planned neighborhood at the northeast corner of Leisure Town and Fry roads, approved by the City Council on March 28, 2017. The city lists Villages D, E, F, G/H and L as under construction (Crowne Communities, KB Home, Beazer Homes, Taylor Morrison) and Villages A, B and C as complete. Build-out date not announced. Roberts' Ranch covers 248 acres in the southeast corner of the city, inside the East of Leisure Town Growth Area, according to builder filings with the city. The master developer is RHS Roberts' Ranch LLC, an affiliate of Regis Homes of Sacramento, city development-agreement records show. Village D shows how the build-out is going piece by piece. A May 2023 filing described 46 lots with five house plans, four of them single-story, and garages loaded from the rear along the main north-south parkway. The City Council approved a final map for 23 homes in Village D-South that year. A June 2025 filing added 16 traditional lots with two plans and an expected start of September 2025. Homes are selling now. Beazer Homes lists Harmony at Roberts Ranch from $664,990 (three to four bedrooms, 1,655 to 2,543 square feet) and Serenity at Roberts Ranch from $817,990 (four to six bedrooms, 2,604 to 3,661 square feet), according to NewHomeSource listings checked Nov. 14, 2026. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in these listings.

Roberts' Ranch Parcel M (Kairos school + 82 homes)
Parcel M, Roberts' Ranch (16.42 ac; 3.65 ac school, 12.77 ac homes)
Proposal to split a 16.42-acre school parcel in Roberts' Ranch: 3.65 acres for a Kairos Public Charter School middle school and gym, and 12.77 acres for 82 single-family lots by Regis Homes. Request filed April 30, 2026; the city held a community meeting Nov. 9, 2026. Not approved.

Rogers Ranch (The Reserve at Browns Valley Ph. 3)
North side of McMurtry Ln, west of Cheyenne
Rogers Ranch: 29 single-family homes. Builder: Lennar. Completion date not announced.

Rosemary Grove at Lagoon Valley
Lagoon Valley
Rosemary Grove at Lagoon Valley. Builder: Taylor Morrison. Completion date not announced.

Sapphire Luxury Apartments
561 Peabody Rd
82 market-rate apartments in four three-story buildings on a vacant 3.83-acre site at 561 Peabody Road. The Planning Commission approved the design review on Aug. 18, 2026. Construction start and completion not announced.

Serenity at Roberts Ranch (Village F)
Sales: 4019 Marshall Rd
Serenity at Roberts Ranch: 55 single-family homes. Builder: Beazer Homes (now part of Dream Finders Homes). Builder lists individual homes available Dec 2026 / Jan 2027; no community finish date announced.

Southtown Phase 3 (incl. KB Sweetbay & Sagebrush at Magnolia Park)
East of Vanden Rd, south of Redstone Pkwy (Magnolia Park area)
242 single-family homes east of Vanden Road and south of Redstone Parkway, listed by the city as under construction; KB Home is building part of it. Completion date not announced.

The Farm at Alamo Creek
NE corner Leisure Town Rd & Elmira Rd (E of Leisure Town, N of Elmira, S of Hawkins)
Approved community of 746 homes (562 single-family and 184 duets, per the city; a 2026 state filing says 768) with parks and neighborhood commercial at the northeast corner of Leisure Town and Elmira roads. Approved Nov. 13, 2018; no construction yet and no builder named. On Oct. 13, 2026 the council extended the development agreement to Jan. 11, 2033 (a legal deadline, not a finish date). The site is 210.5 acres, according to the city, and the developer of record is Vacaville S2 Investors LLC. The council adopted the development agreement by ordinance on Dec. 11, 2018. The original conditions said the tentative map would expire on Nov. 13, 2028, unless a final map was recorded first. A second project depends on this one. The Fields at Alamo Creek, on a 33.6-acre parcel along the Farm's eastern edge, asked to be folded into the Farm's specific plan and would rely on the Farm's roads and utilities. The Planning Commission was scheduled to hear it on Aug. 19, 2025.

The Fields at Alamo Creek
Hawkins Rd, ~0.5 mi east of Leisure Town Rd (east edge of Farm at Alamo Creek)
The Fields at Alamo Creek: 329 single-family homes. Completion date not announced.

The Pointe (Villages at Vanden Unit 5 / Village G)
Vanden Rd & Helmsley Dr, west of Leisure Town Rd (sales on Oakham Dr; homes on Newhaven Dr)
Taylor Morrison's last 97 cluster and courtyard homes in Vanden Meadows (Villages at Vanden Unit 5), near Vanden Road and Helmsley Drive west of Leisure Town Road. Homes are on sale, with some listed as ready November-December 2026. On Oct. 13, 2026 the City Council extended the development agreement to Nov. 22, 2029; that is a legal deadline, not a promised finish date. The Pointe is the tail end of a much older approval. Villages at Vanden is part of the Vanden Meadows plan, which the city approved in 2013 for 780 homes, according to the state filing on this fall's development-agreement amendment. Taylor Morrison of California is the applicant. Homes at The Pointe have three or four bedrooms and run from 1,586 to 2,124 square feet. One move-in-ready home, a 1,586-square-foot plan at 1024 Mansfield St., was listed at $599,000 on Nov. 14, 2026, with a homeowners association fee of $121 a month. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in these listings.

Tramore Village at Vanden Meadows
Sales: 530 Shefford Dr
Tramore Village at Vanden Meadows: 194 single-family homes. Builder: Meritage Homes. Completion date not announced.

Vacaville Gables Apartments acquisition/rehab
131 Gable Ave
Acquisition and rehabilitation of the existing 65-unit Vacaville Gables Apartments at 131 Gable Ave. The City Council approved bond financing in June 2026, according to a summary of the meeting. Not new housing; completion date not announced.

Vacaville Victory Gardens (affordable, veteran focus)
5763 Vanden Rd (west side of Vanden Rd, north of New Alamo Creek)
206 affordable apartments, including 52 permanent supportive homes for veterans, planned at 5763 Vanden Road by Mutual Housing California with partners. Entitled in 2025; financing was still being assembled in early 2026. A 2024 city schedule projected completion in February 2028, but that target has not been confirmed since.

Vanden Meadows (master plan)
Between Nut Tree Rd and Leisure Town Rd, along Vanden Rd
780-home master plan between Nut Tree and Leisure Town roads along Vanden Road, approved in 2013. Builders still active include Taylor Morrison (The Pointe) and Meritage Homes (Tramore Village); earlier Richmond American villages are complete. Build-out date not announced.

Vandengate
East of Vanden Rd, south of Joyce Dr
72-home subdivision east of Vanden Road and south of Joyce Drive by Discovery Builders. Final map recorded Dec. 8, 2025; the council approved a facilities-district annexation for 42 lots on April 14, 2026. Construction start and completion not announced.

Wildhawk II (Village E)
Roberts' Ranch
Wildhawk II: 62 single-family homes. Builder: KB Home. Completion date not announced.

1140 Fifth St. affordable housing
1140 Fifth St.
14-unit affordable housing project with on-site services, approved ministerially in October 2025. Completion date not announced.

2261 Tuolumne St. senior-to-affordable conversion
2261 Tuolumne St.
Conversion of an existing 24-unit independent-living and 69-unit assisted-living senior facility into 93 affordable housing units, approved ministerially in July 2025. Completion date not announced.

7-Eleven gas station (Georgia St.)
Vacant site off Georgia St. (APN 0071-142-510)
Proposed 3,940 sq ft convenience store with an eight-pump fuel station, requesting 24-hour operation and beer and wine sales. Under review; hearings not set.

All Souls Cemetery funeral home building
550 Glen Cove Rd.
Proposed 26,509 sq ft combined funeral home, service and office building at All Souls Cemetery near I-780; needs a zoning text amendment and use permit. Application incomplete as of January 2026.

Blue Rock Springs (proposed)
655 Columbus Pkwy.
The plan to rebuild the Blue Rock Springs golf course and add housing took a step forward on March 24, 2026, when the Vallejo City Council voted unanimously to approve a preliminary concept plan under a profit-sharing agreement. The council kept open the option of a youth center on the site. The city-owned course lost about $4.6 million from 2011 to 2017. In 2017 the city chose to sell a 75-acre piece to pay for a new clubhouse and a better course. The developer, Blue Rock Springs LLC, is a partnership of the Lewis Group and the Greg Norman Company. The city is guaranteed at least $10.5 million for the land, plus 8.15% of lot sales above that amount and a share of any home-sale profits the developer negotiates. The project is estimated at about $23 million. The developer plans to prepare the land and sell the home lots to a builder.

Blue Wave Express Carwash
4375 Sonoma Blvd.
Proposed 4,456 sq ft express car wash with covered vacuum bays and pay station. Planning Commission date not set as of January 2026.

Borges Ranch
Vacant 122-acre site off Borges Ln.
Proposed subdivision of a 122-acre site into 398 residential lots including 68 deed-restricted affordable units, open space and a community park. Under city review; no hearing date set as of January 2026.

Coral Sea Village 8C (Mare Island)
West of Flagship Dr. and Elenor Circle, Mare Island
Lennar's plans for 68 single-family homes and 28 apartments in seven fourplexes on 75 existing lots on Mare Island were approved by the city on Sept. 1, 2026. Completion date not announced.

DXD Self-Storage
1609 Lewis Brown Dr.
Four-story, 138,161 sq ft climate-controlled self-storage building replacing two commercial buildings. Design Review Board recommended it in October 2025; Planning Commission date not set.

Fairgrounds Drive apartments
1700 Fairgrounds Dr.
42 apartments on a 0.94-acre lot with five units for low-income households, approved under SB 35 in March 2024. Construction status and completion date not announced.

Fairview at Northgate - Costco and retail
Admiral Callaghan Ln. and Turner Pkwy.
Vallejo's new Costco opened Friday, Nov. 6, at 860 Admiral Callaghan Lane. The warehouse is about 152,000 square feet and has a gas station with 30 pumps, up from 16 at the store it replaced, KTVU reported. That store, at 198 Plaza Drive less than a mile away, had been open since Dec. 7, 1989, and closed with the move. Shoppers camped out two nights ahead to be first in line, Shawna Gilroy, president of the Vallejo Chamber of Commerce, told the San Francisco Chronicle. It took 15 years to get here. Costco began looking to relocate in 2011, plans for this site were filed in 2017, and the City Council approved the project in June 2020. A lawsuit by Safeway, which has a store nearby, delayed construction, KTVU reported. Work began in June 2024. Costco is the anchor of Fairview at Northgate, a 51-acre project by the Lewis Group of Companies that is still being built. A Raising Cane's restaurant is planned there, and construction on 245 homes is expected to begin in 2027, according to the Chronicle.

Fairview at Northgate - residential amendment
Admiral Callaghan Ln. and Turner Pkwy.
The homes at Fairview at Northgate have been approved at a higher count. A notice the city filed with the state lists the approval date as May 26, 2026. Earlier, on April 20, the Vallejo Planning Commission voted unanimously to amend the master plan and raise the number of homes from 178 to 245 on the same 23.8 acres next to the new Costco. The mix is 119 detached single-family homes and 126 smaller bungalow-style homes built in clusters of three. The developer is the Lewis Group of Companies. The plan includes no affordable housing; the bungalows are expected to start around $550,000, the Vallejo Sun reported. Commission Chair Anthony Taylor said he would like to see housing for a range of incomes. City staff said land development could begin later in 2026, with home construction starting in 2027.

Gateway Apartments
5180 Sonoma Blvd.
343 apartments in nine buildings with an amenity building, replacing a vacant commercial building. Approved by the Planning Commission in November 2023. Construction status and completion date not announced.

Hyundai dealership (Wise Auto)
500 Redwood St.
New 24,963 sq ft Hyundai dealership and car wash on a subdivided 12.45-acre lot, approved by the Planning Commission in January 2025. Opening date not announced.

Jamella Court Subdivision
APN 0068-580-120
Preliminary review for 22 detached single-family homes on a previously recorded tentative map. Completion date not announced.

Mare Island Specific Plan update
Mare Island
Proposed rewrite of the Mare Island plan into nine neighborhoods with up to 14,000 homes and roughly 15,000-17,000 jobs. The city asked for a second draft in February 2026; Mare Island Company submitted a draft infrastructure plan Oct. 29, 2026. Environmental review pending. No approval or timeline.

New Vallejo Police Department building
111 Amador St.
Demolition of the existing police station and construction of a new 89,025 sq ft facility. Under planning review as of January 2026. Completion date not announced.

Porter Street Housing
961 Porter St.
Density-bonus addition of 122 apartments to an existing complex, 20% for lower-income households. Under construction per the city's January 2026 list. Completion date not announced.

Rollingwood Subdivision (KB Home)
201 Rollingwood Dr.
130 market-rate single-family homes approved by the Planning Commission on Nov. 3, 2025 (the city's year-end report counts 131). Completion date not announced.

Senior affordable housing, 720 & 759 Sonoma Blvd.
720 and 759 Sonoma Blvd.
Two affordable senior buildings across Sonoma Boulevard from each other: a 4-story, 20-unit building at 720 and a 6-story, 78-unit building at 759. Application filed but listed as incomplete in January 2026. Completion date not announced.

Solano 360 (county fairgrounds site)
149.1-acre Solano County Fairgrounds site
Solano County's long-planned redevelopment of the fairgrounds, listed in preliminary review on the city's January 2026 list. No details or timeline in that record.

Surf Thru Carwash
Vacant lot on Sonoma Blvd. near Mini Dr. (APN 0067-140-070)
Proposed 5,073 sq ft car wash with canopies on a 1-acre parcel split from a 10.86-acre lot. Application incomplete as of January 2026.

Vallejo Broadway Housing
1765 Broadway
111 apartments with a leasing office and community room on about 4 acres. Approved by the Planning Commission in September 2024. Construction status and completion date not announced.

Vista Cove
NE corner of Shady Ln. and Wildflower St.
Vista Cove has been approved. On March 24, 2026, the Vallejo City Council voted 6-1 to accept the environmental report and approve the plans for 51 detached single-family homes at Shady Lane and Wildflower Avenue in Glen Cove. Councilmember Alexander Matias voted no. About half of the 20-acre site would be built on, with the rest left as open space, according to the state filing. The applicant is Sancerra Vista Cove LLC. The Planning Commission had recommended the project on Jan. 21. Neighbors raised traffic and parking, and one councilmember criticized the lack of affordable housing in the plan, the Vallejo Sun reported. No construction start has been announced.

Vista La Terraza
1390 Eucalyptus Dr.
SB 330 preliminary application for 15 market-rate homes. Completion date not announced.

Waterstone Phase 2A/2B (Tri Pointe)
Waterstone (APN 0082-010-260)
185 market-rate single-family homes were listed as under construction on the city's January 2026 project list. Tri Pointe Homes is selling the neighborhood as Cascade at Waterstone and calls it the last piece of the Waterstone community. Homes have three to six bedrooms and 2,206 to 3,404 square feet, priced from the low $800,000s, according to the builder's site on Nov. 14, 2026. The sales office is at 8017 Bordoni Drive. Solano Daily's publisher, Chris Traina, holds a California real estate salesperson license (CA DRE #02013484) and has no role in these listings. A completion date has not been announced.
Project archive

Pilot Travel Center
5666 Cherry Glen Rd.
Pilot Travel Centers withdrew its proposal for a truck stop at 5666 Cherry Glen Road on September 25, 2026. Vacaville senior planner Albert Enault confirmed the withdrawal to Bay City News on September 28.