Solano Daily
Fairfield, Vacaville, Dixon, Suisun City & Solano County — public records, roads, local government & openings
Coming Soon

Midway Plaza truck stop, with two restaurants, moves ahead at Midway and Lewis roads

Nov 14, 2026 · Vacaville · unincorporated-solano · Solano Daily

What changed

County planning approval

NE corner of Midway and Lewis roads · Solano County (near Vacaville/Dixon)

Jun 30, 2026 · Planning stage reported (Daily Republic)

What’s next · County Planning Commission approved a 14,575 sq ft convenience store, a 4,320 sq ft drive-through restaurant and a 3,000 sq ft restaurant; water-permit steps remain before occupancy.

Last verified Nov 13, 2026

AI illustration of a generic highway travel plaza under construction beside farmland and a roundabout
Illustration generated by AI

VACAVILLE — A truck stop with a convenience store and two restaurants is working its way toward construction at the northeast corner of Midway and Lewis roads, just outside Vacaville city limits. No opening date has been announced.

The project, called Midway Plaza, sits on about 10 acres of unincorporated county land along Interstate 80. Plans call for a 20-space car fueling station, a 10-space truck diesel island, a 14,575-square-foot convenience store, a 4,320-square-foot drive-through restaurant, a separate 3,000-square-foot restaurant and a 16,000-square-foot truck repair shop, according to county planning documents and the Daily Republic.

The Solano County Planning Commission approved the use permit 3-1 in August 2025. Commissioner Kay Cayler cast the no vote. She said she loved the project but not the location. Traffic was the main concern, and as a condition of approval the county will look at traffic again when the permit comes up for its five-year review. A two-year monitoring program will also protect nearby Sweeney Creek from runoff.

The applicant proposed a roundabout where the plaza's entrance meets Midway and Lewis roads. James Bezek, director of the county Department of Resource Management, told commissioners the applicant had exceeded minimum standards, the Daily Republic reported.

The staff report to the commission summed up the project this way: "The project consists of approximately 10 acres, with various buildings and services. This includes a 14,575-square-foot convenience store with a 4,320-square-foot drive-through ... restaurant, a 20-space, 4,500-square-foot automobile gasoline fueling station (and) a 10-space truck diesel fueling station."

The project's state environmental filing lists about 25 jobs.

Water is the catch. At the applicant's request, the county agreed to let construction start before a water permit is issued, but "no occupancy permit will be granted until the water permit is in hand," the Daily Republic reported. As of late June, the project was "still working out water issues" but had moved forward on other permits.

In August, the Board of Supervisors named the plaza's new 500-foot access road Sodhi Circle.

What's next: The county made a water permit a condition of occupancy. The latest permit status is unconfirmed. The restaurant tenants haven't been announced. Solano Daily will check in with county planners and report when construction or tenant news is confirmed.

Send a correction to the editor.